INDEPENDENT CONCEPT BY CELESTUnofficial redesign concept. Not affiliated with or endorsed by K92 Mining Inc.About Celest Concepts ↗

Stage 3 delivered.
Kainantu is scaling.

K92's new process plant is operating and the mine is ramping up. The next growth stage targets a run-rate above 400,000 gold-equivalent ounces a year.2

OFFICIAL K92 MINING PHOTOGRAPHY · KAINANTUSCROLL TO EXPLORE
CURRENT PRODUCTION49,776 oz AuEq

Q3 2026 production1

STAGE 3 · COMMISSIONED1.2 Mtpa

Process plant capacity

STAGE 4 · FUTURE TARGET400,000+ oz AuEq

Annual steady-state run-rate2

A producing mine.
A clearer path forward.

THE STORY BEFORE THE DETAIL

K92 owns and operates the high-grade Kainantu underground gold-copper mine in Papua New Guinea. The Stage 3 process plant completed commissioning in December 2025; mine and infrastructure ramp-up work continues.2

Explore the official Kainantu page ↗
THE EXPANSION PATHCOMPLETED → RAMPING → TARGETED
01 / PRODUCING BASE

Established operation

Kainantu is already a producing underground gold-copper mine.

OPERATING TODAY
02 / STAGE 3

Plant commissioned

New 1.2 Mtpa process plant operating. Mine ramp-up underway.

DELIVERED DECEMBER 2025
03 / STAGE 4

Next scale target

Planned 1.8 Mtpa throughput and 400,000+ oz AuEq annual run-rate.2

LATE 2027 COMMISSIONING TARGET
Kainantu process plant conveyor infrastructure
STAGE 3 IS THE PLATFORM

Growth built on a plant that is now operating.

Stage 4 is planned as an expansion of the Stage 3 plant, rather than a separate new operation.2

BEYOND THE PLANT

Near-mine and regional exploration remain part of K92's growth strategy, including Kora and Judd, Blue Lake, and Arakompa.

Explore the projects ↗

FIGURE NOTES 1. Q3 2026 AuEq production follows K92's conversion assumptions in the October 8, 2026 operating release. 2. Stage 3 and Stage 4 capacity, timing, and run-rate targets are from K92's October 19, 2026 investor presentation. Targets are not actual production.

The people behind
the progress.

K92's 2025 sustainability reporting covers local employment, community partnerships, safety, and environmental performance in Papua New Guinea.

Read the official 2025 report ↗
K92 team members in Papua New GuineaOFFICIAL K92 PHOTOGRAPHY · PAPUA NEW GUINEA

A producing mine.
A wider opportunity.

K92's story starts with an operating underground mine and extends into a nearby gold–copper exploration system. Two distinct projects within the Kainantu region of Papua New Guinea.

01 / OPERATING MINEEASTERN HIGHLANDS, PNG

Kainantu

A high-grade underground gold–copper operation, supported by the newly commissioned Stage 3 process plant and a staged expansion plan.

1.2 MtpaStage 3 plant capacityExplore Kainantu
02 / EXPLORATION PROJECTABOUT 4 KM FROM KAINANTU

Blue Lake

A large gold–copper porphyry discovery southwest of the mine. Its mineral resource points to exploration potential in the wider district.

14.6 Moz AuEq2022 inferred resource; not a reserveExplore Blue Lake

Project descriptions and Blue Lake resource figure: K92 Kainantu Mine and K92 Blue Lake. Mineral resources are not mineral reserves and do not demonstrate economic viability.

OFFICIAL K92 MATERIALOCTOBER 2026

Inside K92.

CORPORATE PRESENTATION
K92 investor presentation slide 1
01 / 55Drag, swipe or use the arrows to browse the 55-page presentation.
View full presentation

The next chapter,
in the detail.

Move from the operating base to the expansion plan. Explore the complete K92 presentation, financial reporting, technical studies, and market information directly from the company.

LISTINGSTSX: KNTOTCQX: KNTNF

An experienced team
behind the operation.

K92 is a Vancouver-headquartered gold producer operating the Kainantu Gold Mine in Papua New Guinea. Its leadership brings together operations, finance, exploration, and local partnerships.

Meet the full K92 team ↗

Leadership roles and portraits from K92's official company page, checked October 2026.

Start a conversation
about Kainantu.

For questions about the operation, investor materials, or K92 Mining, contact the company's Investor Relations team.

CORPORATE OFFICE
Suite 488 – 1090 West Georgia Street
Vancouver, British Columbia
Canada V6E 3V7
Official contact details ↗
GET IN TOUCH

Write to the team.

* Required